by Joshua Dodd | Dec 2, 2020 | Uncategorized
Costa Coffee Edge Lane This project seen JALC Group come onto the job late to take over a previous Civils company that had unfortunately gone into administration. We were left with the challenging task to visit site, price the works and move teams around to ensure we...
by Joshua Dodd | Dec 1, 2020 | Uncategorized
Enterprise Car Hire, Northwich This project consisted of transforming a previous car sales garage into a new modern Enterprise Car Hire franchise site. This £85k package seen JALC Group undertake the full Groundworks and externals package starting with a full site...
by Chris Walsh | Nov 30, 2020 | Uncategorized
Gym / crèche unit – Crewe A full Groundworks and external package carried out by JALC Group for our client” General clear of site. Excavate to reduce levels and dispose from site. New strip footings. New sub base. New ground floor slab. New soft landscaping, paving....
by Chris Walsh | Nov 25, 2020 | Uncategorized
SMH Fleet , St Helens JALC Group were originally appointed to carry out remedial works across this huge site. We then secured the job to carry out complex works on a new oil fuelling station. Concrete slab 225mm thick laid to falls and cross falls, tie into surround...
by Chris Walsh | Nov 25, 2020 | Uncategorized
Knowsley Industrial Unit. JALC Group secured the groundworks and externals package with minor demolition works. Uplift and cart away existing block paving including sand bed. Break out, uplift and cart away existing tarmacadam surface and kerb line. Excavate to...
by Joshua Dodd | Aug 20, 2020 | Uncategorized
Bolton MuslimGirl School This overall scheme comprises of the demolition of existing block and construction of new classroom and toilet block along with associated external works. A tricky project that threw horrendous weather our way along with extremely tight...