Gym / crèche unit – Crewe A full Groundworks and external package carried out by JALC Group for our client” General clear of site. Excavate to reduce levels and dispose from site. New strip footings. New sub base. New ground floor slab. New soft landscaping, paving....
by Chris Walsh | Nov 25, 2020 | Uncategorized
SMH Fleet , St Helens JALC Group were originally appointed to carry out remedial works across this huge site. We then secured the job to carry out complex works on a new oil fuelling station. Concrete slab 225mm thick laid to falls and cross falls, tie into surround...
by Chris Walsh | Nov 25, 2020 | Uncategorized
Knowsley Industrial Unit. JALC Group secured the groundworks and externals package with minor demolition works. Uplift and cart away existing block paving including sand bed. Break out, uplift and cart away existing tarmacadam surface and kerb line. Excavate to...
by Chris Walsh | Aug 19, 2020 | Uncategorized
John St , Warrington , Multiple Units JALC Group carried out full groundwork & externals package including reducing levels / cart muck away, drainage alterations, sub base, slab works and surfacing works Time to discuss your project? Company Name Contact Name...