Gym / crèche unit – Crewe

Gym / crèche unit – Crewe

Gym / crèche unit – Crewe A full Groundworks and external package carried out by JALC Group for our client”   General clear of site. Excavate to reduce levels and dispose from site. New strip footings. New sub base. New ground floor slab. New soft landscaping, paving....
SMH Fleet , St Helens

SMH Fleet , St Helens

SMH Fleet , St Helens JALC Group were originally appointed to carry out remedial works across this huge site. We then secured the job to carry out complex works on a new oil fuelling station. Concrete slab 225mm thick laid to falls and cross falls, tie into surround...
Terumo , Knowsley , Industrial Unit

Terumo , Knowsley , Industrial Unit

Knowsley Industrial Unit. JALC Group secured the groundworks and externals package with minor demolition works.   Uplift and cart away existing block paving including sand bed. Break out, uplift and cart away existing tarmacadam surface and kerb line. Excavate to...