JALC Portfolio

If you have any questions or would like more information on any of our projects please don’t hesitate to contact the team

Costa Coffee Edge Lane

Costa Coffee Edge Lane

Costa Coffee Edge LaneThis project seen JALC Group come onto the job late to take over a previous Civils company that had unfortunately gone into administration. We were left with the challenging task to visit site, price the works and move teams around to ensure we...

Enterprise Car Hire, Northwich

Enterprise Car Hire, Northwich

Enterprise Car Hire, NorthwichThis project consisted of transforming a previous car sales garage into a new modern Enterprise Car Hire franchise site. This £85k package seen JALC Group undertake the full Groundworks and externals package starting with a full site...

Gym / crèche unit – Crewe

Gym / crèche unit – Crewe

Gym / crèche unit – Crewe A full Groundworks and external package carried out by JALC Group for our client”   General clear of site. Excavate to reduce levels and dispose from site. New strip footings. New sub base. New ground floor slab. New soft landscaping, paving....

SMH Fleet , St Helens

SMH Fleet , St Helens

SMH Fleet , St Helens JALC Group were originally appointed to carry out remedial works across this huge site. We then secured the job to carry out complex works on a new oil fuelling station. Concrete slab 225mm thick laid to falls and cross falls, tie into surround...

Terumo , Knowsley , Industrial Unit

Terumo , Knowsley , Industrial Unit

Knowsley Industrial Unit. JALC Group secured the groundworks and externals package with minor demolition works.   Uplift and cart away existing block paving including sand bed. Break out, uplift and cart away existing tarmacadam surface and kerb line. Excavate to...

Bolton Muslim Girls School

Bolton Muslim Girls School

Bolton MuslimGirl SchoolThis overall scheme comprises of the demolition of existing block and construction of new classroom and toilet block along with associated external works. A tricky project that threw horrendous weather our way along with extremely tight working...

Bangor St Medical Centre – Blackburn

Bangor St Medical Centre – Blackburn

Bangor St Medical Centre – Blackburn A reactive maintenance call out to a local NHS centre in Blackburn saw our team investigate a blockage that was backing up into the medical centre. We completed these works by segregating the area of works and putting in place a...

Holy Spirit Catholic School

Holy Spirit Catholic School

Holy Spirit Catholic SchoolThis project saw JALC Group carry out a full groundwork package, transforming the existing section of the school to a new turfed area for the children to play on. This included mechanically reducing levels ready for the import of over 200...

John St , Warrington , Multiple Units

John St , Warrington , Multiple Units

John St , Warrington , Multiple Units JALC Group carried out full groundwork & externals package including reducing levels / cart muck away, drainage alterations, sub base, slab works and surfacing works [dica_divi_carousel advanced_effect="1"...

Share This