Holy Spirit
Catholic School
This project saw JALC Group carry out a full groundwork package, transforming the existing section of the school to a new turfed area for the children to play on.
This included mechanically reducing levels ready for the import of over 200 tonnes of top soil and turfing the new grassed area. We altered the existing drainage and installed concrete edgings to accommodate the new tarmac pathway around the perimeter of the new grass area.
We completed these works within a tight 2-week timeframe during the school holidays enabling the school to open and business as usual.
Time to discuss your project?